跳至主要内容
Asia

Diageo

Design and fit-out of new global headquarters building

服务类别 (8)

行业领域

地点

London, United Kingdom

客户

Diageo

建筑设计

MCM

Diageo engaged Cundall from the building search stage to locate, assess and deliver their new London-based global HQ. The multi-disciplinary Cundall team took the project from technical due diligence to AFL negotiations and then into the fit-out delivery, providing MEP, specialist lighting, fire, security, and acoustics expertise. The team developed the brief through extensive stakeholder engagement from an interested and expert client, identifying opportunities for SMART building, net zero carbon, inclusivity and sustainability within the scheme and providing experienced consultancy on each.

Throughout the project the Cundall team was managed internally by a fully multi-disciplinary delivery team. This simplified project communications with the client and project management team, as well as funnelling information to the relevant disciplines seamlessly to streamline delivery.

In addition to our role on the fit-out, Cundall provided basebuild monitoring and designed variations to the Lazari Investments scheme to enable the building to support Diageo’s aspirations for an inclusive and flexible new home. The variations enable the building to support two best in class bars, four catering spaces, including staff canteen, and a variety of client dining, a digital customer engagement centre, flexible auditorium and first-class wellness facilities.

Kevin Hayes, Cundall Partner, said "Diageo’s aspirations for a flexible, inclusive workspace with sustainability and wellness integral to the design have led to several innovations on the project. A dedicated wellness floor at the top of the building and a staff bar and shop at ground level are just some of the facilities included in the design. To support this, Cundall enhanced the building’s ventilation systems and deployed environmental space monitoring sensors and SMART technologies to help achieve the quality of environment such a progressive space required."

Key fact

Cundall designed a bespoke sustainability and inclusion framework to meet Diageo’s thought leading aspirations.

1/3

Key fact

Sustainable technologies such as HVRF are deployed to provide HVAC from a small footprint with the minimum of modern refrigerants in use.

2/3

Key fact

The sustainability objectives are backed up Net Zero Carbon Assessments for operation and construction which have resulted in removal of gas from the scheme.

3/3

Kevin Hayes

Partner, Building Services

查看个人简介

Extensive engagement with stakeholders, from inception to delivery was key to the success of the project, ensuring each element of the client team received the building they expected.

奖项

Winner

Project of the Year: Workplace Interiors 70k+ sq ft.

Mixology23

Winner

BCO London / South East awards

Fit out of the year

相关文章