Eaton Hotel Chiller Replacement

Location Hong Kong, China 
Services Building performance services and acoustics
Sector Lifestyle
Client Grow on Developments
 

Joe Tang

T +852 5806 1500

Through an initial appraisal of potential Energy Management Opportunities (EMO) within the hotel, Cundall identified a solution which reduced energy consumption whilst increasing resilience for hotel operations.

We provided lead consultancy to replace the chiller plant, mounted at roof level of the 23-storey hotel block. The replacement plant solution targeted energy efficiency and value for money, with resilience and robust engineering to keep the hotel operational.  Variable speed chillers plant with new optimisation of the Automatic Control System (ACS) provided the best solution.

The further challenge, successfully overcome, was to organise the design, procurement and sequence of work to minimise disturbance and interruptions to hotel operations during the project.

Our local sub-consultants, Altus Group and Albert Lui & Associates provided quantity surveying and structural engineering respectively. Cundall provided project management, building services engineering and acoustic advice in-house.